This railtour was originally
scheduled to operate on 16th April 1994. However,
due to planned industrial action by Iarnród Éireann staff
the railtour was postponed. The re-scheduled railtour
operated on 20th August 1994 and ran as booked.
The train was formed of
Iarnród Éireann Cravens coaches.