This
railtour was originally advertised as a farewell railtour
for the NIR DH locomotives. Unfortunately, locomotive 2
failed the day beforehand after putting a piston through the
engine block whilst running light engine from York Road
Works to Central Services Depot. Therefore NIR provided
locomotives 101 and 104 as last minute replacements. The
train was formed of RPSI wooden bodied coaches.
