Locomotive C231 was built for Coras Iompair Éireann (CIE), the Irish State owned transport company, by Metropolitan Vickers at their premises at Dukinfield, Manchester, in 1956. C231 was part of a class of 34 Bo-
The contract to build these locomotives was signed at Heuston Station, Dublin, on 5th May 1954. The bodies for the thirty-
C231 entered traffic with CIE on 1st January 1958. When built, these locomotives were originally fitted with a Crossley ESTVee8 engine of 550 hp. However, the Crossley engines proved to be extremely troublesome and unreliable. In 1969, the decision was taken to re-
Following several years stored in the scrap line at Iarnród Éireann’s Inchicore Works in Dublin, 231 was purchased by the Irish Traction Group on 16th November 1992, originally as a source of spare parts for 226, for the sum of I£ 930 plus VAT. It was moved from Inchicore Works to Carrick-
In December 1995, after spending nearly three years in store at Carrick-
In June 1999 Iarnród Éireann offered the Group the opportunity to have the locomotive shipped to the UK on a low-
Following this, the locomotive was shipped back to Inchicore Works, Dublin, in August 2000, following its display at the Old Oak Common Depot open weekend on 5th and 6th August 2000. It was then the intention to have Iarnród Éireann undertake further work on the locomotive to complete its restoration. However, this never happened, but most of the remaining work has since been undertaken by ITG volunteers.
Locomotive C231 was moved by low-
Since a good deal of preparatory work had already been done to C231, a decision was made late in 2013 to move the locomotive to Downpatrick & Co. Down Railway (DCDR), with a view to completing the work and returning C231 to an operational condition. This move was carried out between 4th and 7th June 2014, the locomotive arriving at DCDR at around 3am on the 7th June.
Over the course of the morning, C231 was carefully unloaded with the help of locomotive G617, prior to being moved through the carriage shed and onto the running line. Locomotive 146 completed the shunt, moving C231 to its new home in the Maghera shed where the tarpaulins were finally removed and it will undergo extensive checks to identify the work required to bring it back working order.
After C231 had been ‘unwrapped’, volunteers got straight to work carrying out some essential initial checks. This continued on the 8th June and late in the afternoon, after installing a freshly charged set of batteries, it was decided that an attempt would be made to start the engine. Oil was pumped round the engine until it appeared in all the places it should be. At approximately 16:10, the start handle was turned and 11 seconds later, the engine burst into life with minimal clag.
The engine was stopped after a few minutes and then restarted with the purpose of fault finding in mind. A number of issues were noted and the engine shut down for the night.
231's made a brief debut at the 2014 Irish Traction Group diesel gala at Downpatrick in October 2014, but then spent the next four years or so at the back of the queue for restoration work as the pressures of running a railway at Downpatrick and keeping the other diesels running took precedence.
With the ITG's 30th anniversary looming, and a desire to have C231 back in action for an October deadline, the ITG Downpatrick team started working away quietly as time permitted to address faults on the loco with a view to running it in passenger service for the first time since 2014.
Work included attention to the batteries, the coolant system, pipework under the floor and finally mechanical success was declared in September 2019 when the locomotive was successfully started and made a few test runs up and down the loco yard.
With the gala only a week way, test runs were carried out on October 5th to see how the loco performed under load. Up to notch 3 things seemed quite good, but when power built an alarming BANG was heard as a contactor tripped out. Some frantic tinkering over the following days saw this hopefully fixed, with some final tweaks on the day of the gala itself on 12th October, and the C was well enough to do a passenger run or two. A final surprise was the working of C231 in multiple with B Class 146 at the end of the day, something that the team had been long planning - and it worked! C231 even got to haul the ECS home that evening as well.
Further wiring work and a myriad of minor repairs remain before C231 can be considered fully available for traffic, so the loco remains in the 'under restoration' category for now.